603 Welding and Erection LLC
Manchester, NH · USDOT 4373767
01
The company
- Legal name
- 603 Welding and Erection LLC
- Base
- Manchester, NH. Service-area business - we come to you
- Founded
- 2024
- Owner
- Zachary Oak, President. Ten years in the trade
- USDOT
- 4373767
- Union status
- Open shop
- Prequalification
- Set up on Building Connected for general contractor bid lists
- Veteran owned
- The owner served in the US Army, 2018 to 2026. No federal set-aside certification is held or claimed
02
What we do
Steel erection and structural welding are the two trades this company offers, and both can sit on a single contract.
Erection
Crane placement and shake-out, columns stood, beams and bar joists connected working back toward the crane, plumbing, bolting up, bridging and torquing to spec, metal decking landed floor by floor, then welded off, screwed at the laps and detailed out with pour stop. Full scope, first column to last deck weld: the erection scope on site.
Structural welding
Wind brace, moment connections, column splices and whatever else sits in the weld details, run in flux core wire feed and handed to the general contractor's welding inspector. A lot of the work is the weld scope on site for other steel erection companies, on their contracts.
Also offered
- Bar joist reinforcement and panel point reinforcing
- Beams and columns
- Metal decking
- Stairs, stringers, headers and pans
- Handrail, guardrail and stair railing
- Catwalks and mezzanines
- Grillage and rooftop unit frames
- Rooftop equipment supports
- Miscellaneous metals
- Heavy equipment repair
- Bucket and attachment repair
- Trailer repair
- Mobile and on-site welding
- Emergency welding repair
Not taken on
Auto body and frame repair. Carbon steel is the trade here. If a job is a different metal you get told on the phone rather than after a site visit.
03
Certifications
AWS D1.1
Structural Welding Code - Steel
AWS D1.8
Structural Welding Code - Seismic Supplement
AWS Certified Welder
—
603 makes no trade-credential claim beyond what is documented here. What this page carries is the AWS standard the welds are made to, the third-party inspector who signs them off, and the insurance behind the work.
04
Safety training
- OSHA 10
- OSHA 30
- Fall protection
- Aerial and scissor lift
- Rigging and signaling
- Confined space
- Hot work permit
Site-specific requirements are worked to as written. If your site runs a stricter standard than OSHA minimums, send it with the bid invite and it gets priced in rather than argued about on the first morning.
05
Insurance and compliance
- General liability
- 1M / 2M
- Workers compensation
- Carried
- Certificates of insurance
- Same day on request
- USDOT
- 4373767
- Prevailing wage
- Performed
- Union status
- Open shop
Certificates of insurance go out the same day they are asked for. Anything your contract needs beyond a standard certificate is worth raising on the call so it can be checked with the carrier first.
06
Processes and materials
Processes
- Flux-core arc welding (FCAW) - the primary process
- Gas metal arc welding (GMAW / MIG)
- Shielded metal arc welding (SMAW / stick)
- Oxy-fuel cutting
- Carbon arc gouging
Materials
- Carbon steel
- Structural carbon steel: ASTM A992, ASTM A36
Flux core wire feed is the reason erectors bring us in on schedule-critical weld scope. It lays down metal considerably faster than stick, and on a job where the deck cannot go on until the connections are welded out, that difference shows up in the programme rather than in the weld.
07
Equipment that goes to site
- Ram 3500 dually with a flat bed
- Lincoln Vantage 500 diesel welder
- LN-25 wire feeders and welding leads
- Telehandlers
- Forklifts
- Scissor lifts
- Boom lifts
The welding plant travels on the truck, so the work happens at your site or your yard rather than coming back to a shop.
08
How we bid
- 01
Bid invite
Sent with the structural and architectural drawings, through Building Connected or straight to the email below.
- 02
Site walk
In person, on the job, going through the scope and the drawings together.
- 03
Proposal
Priced off the drawings and the details, not off a description. Written for big work, a number on the phone for small work. Free, always.
- 04
Contract
Proposal accepted, agreement in place, steel moves.
- 05
Inspection
Structural inspectors through the phases against the engineer's specification, and a final inspection at the end.
09
Paperwork we handle
Hot work permits. Site safety plans. Insurance certificates.
I work to whatever the site requires.
That matters most on the jobs that are still trading while the steel goes in, where the permit file and the safety plan are the difference between working and standing around. We carry work on occupied commercial sites and the permit file and site safety plan are part of that scope, not an afterthought.
10
Commercial terms and warranty
- Payment terms
- Net 30
- Methods
- Check / bank transfer or ACH / cash / Net 30 invoice
- Estimates
- Free, always
- Quote format
- Written for big jobs, a number on the phone for small ones
- Warranty
- New construction carries the standard one-year warranty
On the warranty, the owner's own position goes further than the term does: “if something is wrong I will usually go out and take care of the issue no questions asked” That is a commitment in his voice, not a clause, and it is written here as exactly that.
No prices, rates or turnaround figures are published. Both depend entirely on the job, and a number posted on a website is a number that is wrong for most of the work.
11
Radius, states and hours
Manchester, NH, and any town inside a 100-mile radius, across New Hampshire, Massachusetts, Maine and Vermont. No travel fee - it is inside the estimate.
Regular hours are Monday to Friday, 4am to 8pm EST. Separately, and it is a separate thing, there is a 24/7 line for machines down outside working hours. Scheduling and quoting happen inside the working week; a stopped machine does not wait for it.